首页 › 答案 › 题库 › 慕课 › 未分类

Railway construction moved ahead very swiftly, on the basis of a mixture of central and local funding from the beginning of the 1990s.

Railway construction moved ahead very swiftly, on the basis of a mixture of central and local funding from the beginning of the 1990s.
A.正确
B.错误
正确答案:正确