首页
›
答案
›
题库
›
才高八斗
As stipulated in the contract, the bank() open an L/C before the end of September2009.
As stipulated in the contract, the bank() open an L/C before the end of September2009.
A、will
B、ought
C、need
D、shall
正确答案:D
上一条:
It needs() that the L/C should reach us 30 days before the month of shipment.
下一条:
We advised our bank to() L/C No. 12345 to read “Partial shipments to be permitted”.