首页 › 答案 › 题库 › 才高八斗

As stipulated in the contract, the bank() open an L/C before the end of September2009.

As stipulated in the contract, the bank() open an L/C before the end of September2009.
A、will
B、ought
C、need
D、shall
正确答案:D